首页> 外文期刊>Generation, Transmission & Distribution, IET >Overview of the Australian national electricity market transmission use of system charges for integrating renewable generation to existing grid
【24h】

Overview of the Australian national electricity market transmission use of system charges for integrating renewable generation to existing grid

机译:澳大利亚国家电力市场概述使用系统收费将可再生能源发电整合到现有电网中

获取原文
获取原文并翻译 | 示例
           

摘要

The Australian government has introduced the expanded renewable energy target scheme that aims to ensure that 20% of Australia??s electricity supply is generated from renewable sources by 2020. Hence, this will drive large changes and have direct effects on behaviour and investment in Australia??s market environment especially transmission use of system (TUoS) charges scheme. Therefore this study is intended to explore the TUoS charges in the Australian national electricity market (NEM) to the development of renewable generation. There are three issues that are focused in this paper: (i) the transmission configurations for connecting the remote generation cluster to the existing grid; (ii) the Australian NEM TUoS charges; and (iii) the Australian energy market operator policy on the allocation of the cost of providing shared transmission services to different parties for new and existing terminal stations. The 59-bus system of the South East Australian power system is used for the case study in order to verify the concepts and determine the efficient and economic way to connect a new renewable generation to the existing grid.
机译:澳大利亚政府推出了扩大的可再生能源目标计划,旨在确保到2020年澳大利亚20%的电力供应来自可再生能源。因此,这将推动重大变化,并直接影响澳大利亚的行为和投资市场环境特别是传输系统使用费(TUoS)收费方案。因此,本研究旨在探讨澳大利亚国家电力市场(NEM)中可再生能源发电的TUoS收费。本文着重讨论三个问题:(i)将远程生成集群连接到现有电网的传输配置; (ii)澳大利亚NEM TUoS收费; (iii)澳大利亚能源市场运营商政策,该政策分配了为新的和现有的终端站向不同方提供共享传输服务的成本。案例研究使用了澳大利亚东南部电力系统的59总线系统,以验证概念并确定将新型可再生能源连接到现有电网的有效且经济的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号