Scheduled incremental and unscheduled interchange cost components of transmission tariff allocation: a novel approach for maintaining the grid discipline

机译:输电电价分配的计划增量和非计划互换成本组成部分:维持电网规范的新方法

获取原文
获取原文并翻译 | 示例
           

摘要

A novel approach of transmission tariff allocation (TTA) is proposed in this study. TTA comprises scheduled incremental cost (SIC) and unscheduled interchange cost (UIC) components. This approach demonstrates the use of proposed SIC and UIC components of tariff in incremental revenue reconciliation along with the provision of heavy penalty to maintain the grid discipline against extreme unscheduled withdrawal. SIC has been allocated to users of transmission network for their scheduled injections or withdrawals. UIC take care of excessive unscheduled interchange (UI) in load or generation. Incremental power flow in MVA is used to asses and allocation of these components. The scheduled increment (SI) in load or generation is associated with planned load growth rate whereas the UI in load or generation may arise intermittently. All generating units are participating to generate both active and reactive power as per their generation participation factor to match the SI and UI demands. The SIC component may be added to the nominal TTA to user. The UIC component of tariff is an additional burden or penalty imposed on users because of extreme unscheduled withdrawal. The results are obtained for SIC and UIC components of TTA by using 6 bus and IEEE 14 bus systems.
机译:在这项研究中提出了一种新颖的输电费分配方法。 TTA包含计划的增量成本(SIC)和计划外的交换成本(UIC)组件。这种方法展示了在增加的收入对账中使用拟议的SIC和UIC关税组成部分,并提供了重罚以维持电网纪律,防止极端计划外的提款。已将SIC分配给传输网络的用户进行计划的注射或退出。 UIC会处理负载或生成中过多的计划外交换(UI)。 MVA中的增量功率流用于评估和分配这些组件。负载或生成中的计划增量(SI)与计划的负载增长率相关联,而负载或生成中的UI可能会间歇出现。所有发电机组都参与根据其发电参与因子来产生有功和无功,以匹配SI和UI需求。可以将SIC组件添加到用户的名义TTA。 UIC关税的组成部分是由于极端计划外的提款而给用户带来的额外负担或惩罚。通过使用6总线和IEEE 14总线系统获得TTA的SIC和UIC组件的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号