首页> 外文期刊>Generation, Transmission & Distribution, IET >Methodology of risk assessment and decomposition in power grid applications
【24h】

Methodology of risk assessment and decomposition in power grid applications

机译:电网应用中的风险评估和分解方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The most common approach to risk assessment for power systems is based on the $N - 1$N-1 principle. Nevertheless, the economic rationale suggests its relaxation in cases where the consequences are relatively minor and exacerbation when they are large. This study addresses this need by proposing an alternative operational risk assessment methodology that is based on both probabilities and costs of possible contingencies. The foundations are built on listing all possible contingencies that may be considered by the transmission system operator (TSO). As only a subset of these contingencies can be examined in reasonable time, the upper and lower risk boundaries are introduced to quantify the risk underestimation. The ratio of those limits is used as an accuracy indicator, which - according to the desired level - may help the TSO to identify the required number of contingencies that have to be analysed. Furthermore, several approaches to improve the reduction of the number of simulated contingencies are discussed and the results obtained basing on the dynamic IEEE39 model are presented.
机译:电力系统风险评估的最常见方法是基于$ N-1 $ N-1原则。然而,从经济原理上讲,如果后果相对较小,则放宽,而后果严重时则加剧。这项研究通过提出一种基于可能发生的事件的概率和成本的替代性操作风险评估方法来满足这一需求。这些基础是建立在列出传输系统运营商(TSO)可能考虑的所有可能的意外事件之上的。由于只能在合理时间内检查这些意外事件的一个子集,因此引入了上下风险边界以量化风险低估。这些限制的比率用作精度指标,根据所需的级别,该指标可以帮助TSO识别必须分析的所需突发事件数量。此外,讨论了几种减少模拟意外事件数量的方法,并介绍了基于动态IEEE39模型获得的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号