...
首页> 外文期刊>Generation, Transmission & Distribution, IET >Towards efficient real-time deviation settlement mechanism for the Indian grid
【24h】

Towards efficient real-time deviation settlement mechanism for the Indian grid

机译:建立印度电网的高效实时偏差解决机制

获取原文
获取原文并翻译 | 示例
           

摘要

In the present Indian scenario, the real-time deviations are settled based on a deviation charge linked to average block frequency. This charge remains uniform across the country irrespective of the occurrence of congestion. Thus, it does not include the locational effect, which may devoid better investment signals and efficient system operation. Therefore, this study proposes an efficient real-time deviation settlement mechanism for the Indian grid, which incorporates the locational signal in the deviation charges. The proposed method introduces a new network adjustment charge (NAC) for each state, which is determined a priori using the nodal prices obtained from an optimal power flow model and using deviation elasticity of the states. This NAC will be added to the existing deviation charge, in each time block for the real-time deviations of the entities and discourage them from deviating in the occurrence of congestion. This method will help in bringing convergence between the deviation charges and another parallel trading mechanism facilitated by power exchanges. The proposed methodology is implemented and validated on a practical data of southern regional grid of India.
机译:在当前的印度情景中,实时偏差基于链接到平均模块频率的偏差费用确定。不论拥塞发生在全国各地,这项收费都是统一的。因此,它不包括位置效应,后者可能会缺少更好的投资信号和有效的系统运行。因此,本研究为印度电网提出了一种有效的实时偏差解决机制,该机制将位置信号纳入偏差费用中。所提出的方法为每个状态引入了新的网络调整费用(NAC),该费用是使用从最佳潮流模型获得的节点价格并使用状态的偏差弹性事先确定的。该NAC将在每个时间块中添加到现有的偏差费用中,以用于实体的实时偏差,并阻止它们在拥塞发生时发生偏差。此方法将有助于使偏离费用与通过电力交换促进的另一种并行交易机制之间的收敛。拟议的方法在印度南部区域网格的实际数据上得到实施和验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号