...
首页> 外文期刊>Fusion Science and Technology >EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION
【24h】

EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION

机译:欧洲技术努力的基础

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Europe has started since the 80s with the preparatory work done on NET, the Next European Torus, the successor of JET, to prepare for the construction of the next generation experiment on the road to the fusion reactor. In 2000 the European Fusion Development Agreement (EFDA) has been signed by sixteen countries, including Switzerland, not a member of the Union. Now the signatory countries have increased to twenty-five. A vigorous programme of design and R&D in support of ITER construction has been conducted by EFDA through the coordinated effort of the national institutes and laboratories supported financially, in the framework of the VI European Framework Research Programme (2002-2006), by contracts of association with EURA TOM. In the last three years, with the expenditure of 160 M?, the accent has been particularly put on the preparation of the industrial manufacturing activities of components and systems for ITER. Prototypes and manufacturing methods have been developed in all the main critical areas of machine construction with the objective of providing sound and effective solutions: vacuum vessel, toroidal field coils, poloidal field coils, remote handling equipment, plasma facing components and divertor components, electrical power supplies, generators and power supplies for the Heating and Current Drive Systems and other minor subsystems. Europe feels to be ready to host the ITER site and to provide adequate support and guidance for the success of construction to our partners in the ITER collaboration, wherever needed.
机译:从80年代开始,欧洲就开始在NET上做准备工作,JET的后继者Next Europe Torus为在聚变反应堆的道路上建设下一代实验做准备。 2000年,包括瑞士在内的16个国家(不是欧盟成员国)签署了《欧洲融合发展协议》(EFDA)。现在签署国已增加到25个。 EFDA通过在VI欧洲框架研究计划(2002-2006)的框架下,通过结社合同,在国家机构和实验室的共同努力下,由EFDA实施了一项大力支持ITER建设的设计和研发计划。与EURA TOM。在过去的三年中,由于花费了1.6亿欧元,该口音特别用于准备ITER组件和系统的工业制造活动。已在机械制造的所有主要关键领域开发了原型和制造方法,目的是提供合理有效的解决方案:真空容器,环形场线圈,极向场线圈,远程处理设备,面向等离子体的组件和偏滤器组件,电力供热和电流驱动系统以及其他次要子系统的电源,发电机和电源。欧洲感到随时准备接待ITER站点,并在任何需要的地方为我们的ITER合作伙伴提供成功建设的充分支持和指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号