The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseilles. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners, organized in domestic agencies for the in-kind procurement of components, is a key issue for the success of the experimentation.rnITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production.rnThe main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions.rnThe licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the preliminary safety report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to start the nuclear buildings construction. In parallel, France, responsible for site preparation will also launch authorization requests to enable standard constructions, electric supply, site clearance and road upgrades for heavy load transportation, which are not safety-related permits but have to follow an administrative approval.rnThe Agency ITER France, representing the future organization on behalf of ITER partners, is already participating in public debates organized by an independent authority.
机译:ITER的建设地点已于2005年6月选定。该设施将在法国南部,靠近马赛的欧洲实施。现在正在修订通用安全方案,以使设计适应东道国的法规。尽管ITER将是一个国际组织,但它必须在公共和职业健康与安全,核安全,辐射防护,许可,核物质和环境保护领域中遵守法国的要求。中央团队及其合作伙伴的组织,是在国内机构中进行的,以实物形式采购零件的组织活动,是实验成功的关键问题。rnITER是第一个实现持续核聚变的设施。对于实验性的一种装置,ITER本身以及对聚变电站的未来而言,充分理解这种潜在的新能源生产来源的关键安全问题都非常重要。 ,真空容器中的活性粉尘和等离子体组件冷却液中的活性腐蚀产物。在设计中,这可以通过多个限制障碍来实现,以实现纵深防御方法。将在提交给法国监管机构的文件中证明,这些障碍物在所有假定的事故和事故情况下均能保持其功能。许可过程始于对安全选项的审查。欧洲已在2002年的候选资格阶段中执行了此步骤。在最终设计的同时,并考虑到当地法规,将在欧洲合作伙伴和框架中的其他人员的支持下起草初步安全报告(RPrS)。 ITER任务协议。 RPrS将与许可申请一起转发给监管机构,后者将启动公众听证会和安全审查。这两个过程必须成功才能启动核建筑的建设。同时,负责场地准备的法国还将发起授权请求,以实现标准建筑,电力供应,场地清理和重载运输的道路升级,这不是安全相关的许可证,但必须获得行政批准。法国代表国际热核实验堆伙伴的未来组织,已经参加了由独立机构组织的公开辩论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号