首页> 外文期刊>Fusion Engineering and Design >Test Blanket Module Maintenance Operations Between Port Plug And Ancillary Equipment Unit In Iter
【24h】

Test Blanket Module Maintenance Operations Between Port Plug And Ancillary Equipment Unit In Iter

机译:Iter中端口插头和辅助设备单元之间的测试毯模块维护操作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In collaboration between the FZK and KFKI-RMKI, in the frame of the activities of the EU Breeder Blanket Programme a concept for test blanket module (TBM) integration, maintenance schedules and all required special purpose equipments has been developed. During the first 10 years of ITER operation four different plasma scenarios will be used. Hence it will be possible to investigate the characteristics (e.g. tritium breeding performance) of different TBM concepts which will be installed during operation for the different phases of ITER operation in the equatorial ports #2, #16 and #18. In every port two TBMs will be accommodated, in the port #16 will be the European helium-cooled pebble bed blanket. In different phases of ITER operation different TBMs will be used. Therefore a complex maintenance process is necessary for the exchange of TBMs. Two TBMs are mounted onto one common frame, into a port plug (PP), which offers a standardised interface to the vacuum vessel (VV). It is cantilevered with a flange to VV port extension. This attachment system is the same in every equatorial port, so the exchange process of this structure with the TBMs is also the standard operation of ITER. Several components of the helium cooling system of the EU breeder modules, valves, pipes, gas mixers, thermal sleeves, pipes for tritium extraction, measurement system are integrated into the ancillary equipment unit (AEU), which during the operation will connect the port plug to the subsystems. The bigger part of the AEU is accommodated in the port cell and the rest part of it is penetrated into the interspace inside the bioshield and reach the back plane of the installed PP. The remote handling operations for connection/disconnection of an interface between the PP of the EU-TBMs and the AEU are investigated with the goal to reach a quick and simple TBM exchange procedure. The current design of the EU-TBMs foresees up to 18 supply lines for both TBMs. These lines have to be connected here. A new concept was worked out for fitting into each other these 18 pipe-ends and the opposite ones together at the same time in only one step before welding. A special mechanical system is developed, which can transfer the robot from its storing place in the AEU in the port cell to the interface on 6 m distance. This mechanism has a minimized space requirement, and able to send in the robot and all the tools stored in the tool-magazine together. Weld seams can be made by orbital welding tool (OWT). The coolant is helium, so for eliminating the leak of helium it is of high importance to find a safe way for weld seam audit. The installation and removal of thermal insulations around the pipes at the interface is an additional requirement which has to be met by a special tool.
机译:在FZK和KFKI-RMKI之间的合作下,在欧盟育种毯计划的活动框架内,开发了测试毯模块(TBM)集成,维护时间表和所有必需的专用设备的概念。在国际热核实验堆运行的头十年中,将使用四种不同的等离子体方案。因此,有可能研究在ITER运行的不同阶段在赤道#2,#16和#18的ITER运行的不同阶段安装的不同TBM概念的特性(例如tri的繁殖性能)。每个港口将容纳两个TBM,而16号港口将容纳欧洲氦冷却的卵石床毯。在ITER操作的不同阶段,将使用不同的TBM。因此,更换TBM需要复杂的维护过程。两个TBM安装在一个公共框架上,并安装在端口插头(PP)中,该端口插头提供了到真空容器(VV)的标准接口。它的悬臂采用法兰连接VV端口扩展。该附件系统在每个赤道港口都是相同的,因此这种结构与TBM的交换过程也是ITER的标准操作。 EU饲养员模块的氦冷却系统的几个组件,阀门,管道,气体混合器,热套管,for提取管,测量系统已集成到辅助设备单元(AEU)中,在运行过程中将连接端口插头到子系统。 AEU的较大部分容纳在端口单元中,其余部分则渗透到生物防护罩内部的空隙中,并到达已安装PP的背面。对EU-TBM的PP和AEU之间的接口的连接/断开连接的远程处理操作进行了研究,目的是实现快速简便的TBM交换过程。 EU-TBM的当前设计预计两个TBM最多有18条供应线。这些线必须在这里连接。提出了一个新概念,可以在焊接前仅一步之遥将这18个管端和相对的管端同时装配在一起。开发了一种特殊的机械系统,可以将机器人从端口单元AEU中的存储位置转移到6 m距离的接口上。这种机制具有最小的空间需求,并且能够将机器人和所有存储在工具杂志中的工具一起送入。焊缝可以通过轨道焊接工具(OWT)制成。冷却液是氦气,因此,为了消除氦气的泄漏,找到一种安全的焊缝审核方法非常重要。在接口处管道周围的隔热层的安装和拆卸是附加的要求,必须通过专用工具来满足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号