首页> 外文期刊>Fusion Engineering and Design >5 MW CW supply system for the ITER gyrotrons Test Facility
【24h】

5 MW CW supply system for the ITER gyrotrons Test Facility

机译:用于ITER旋流器测试设施的5 MW CW供应系统

获取原文
获取原文并翻译 | 示例
           

摘要

ECH (Electron Cyclotron Heating) for ITER will deliver into the plasma 20 MW of RF power. The procurement of the RF sources will be shared equally between the three following partners: Europe, Japan and Russia. Moreover, Europe decided to develop a RF source capable of 2 MW CW of RF power, based on the design of a coaxial gyrotron with a depressed collector. In order to be able to develop and test these RF sources, a Test Facility (TF) has been built at the CRPP premises in Lausanne (CH). The present paper will first remind the main operation conditions considered to test safely a gyrotron. The power supplies parameters allowing to fulfill these conditions will be reviewed. The core of the paper content will describe the newly installed Main High Voltage Power Supply (MHVPS), to be connected to the gyrotron cathode and capable of -60 kV/80 A-CW. The principle, the characteristics, the on-site test results will be described at the light of the requirements imposed by the gyrotron testing. Particular aspects of the installation and commissioning on-site will be highlighted in comparison with the ITER environment. The synchronized operation of the MHVPS and the BPS (Body Power Supply) on dummy load, piloted through the TF remote control, will be presented and commented. Since the TF supply structure has been built integrating the particular conditions and requirements expected for ITER, a conclusion will summarize the performances obtained at the light of these criteria.
机译:用于ITER的ECH(电子回旋加速器)将向等离子体传递20 MW的RF功率。射频源的采购将在以下三个合作伙伴之间平均分配:欧洲,日本和俄罗斯。此外,欧洲基于具有凹入式集电极的同轴回旋管的设计,决定开发一种具有2 MW CW射频功率的射频源。为了能够开发和测试这些RF源,已经在洛桑(CH)的CRPP办公地点建立了测试设施(TF)。本文首先将提醒考虑安全测试回旋管的主要工作条件。将审查允许满足这些条件的电源参数。本文内容的核心将描述新安装的主高压电源(MHVPS),该电源将连接到回旋加速器阴极并具有-60 kV / 80 A-CW的能力。将根据回旋加速器测试的要求来描述其原理,特性和现场测试结果。与ITER环境相比,将重点介绍现场安装和调试的特定方面。将介绍和评论MHVPS和BPS(车身电源)在虚拟负载上的同步操作,该操作通过TF遥控器进行控制。由于已经建立了TF供应结构,整合了ITER预期的特定条件和要求,因此结论将总结根据这些标准获得的性能。

著录项

  • 来源
    《Fusion Engineering and Design》 |2011年第8期|p.872-875|共4页
  • 作者单位

    Centre de Recherche en Physique des Plasmas, Association EURATOM - Confederation Suisse, Ecole Polytechnique Federate de Lausanne, CH-1015 Lausanne, Switzerland;

    Fusion for Energy, Barcelona, Spain;

    Fusion for Energy, Barcelona, Spain;

    Centre de Recherche en Physique des Plasmas, Association EURATOM - Confederation Suisse, Ecole Polytechnique Federate de Lausanne, CH-1015 Lausanne, Switzerland;

    O.C.EM. SpA. San Giorgio di Piano, Italy;

    Centre de Recherche en Physique des Plasmas, Association EURATOM - Confederation Suisse, Ecole Polytechnique Federate de Lausanne, CH-1015 Lausanne, Switzerland;

    O.C.EM. SpA. San Giorgio di Piano, Italy;

    O.C.EM. SpA. San Giorgio di Piano, Italy;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    CPD gyrotron; ITER test facility; ITER ECH power supplies;

    机译:CPD回旋管;ITER测试设施;ITER ECH电源;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号