首页> 外文期刊>Fire Prevention & Fire Engineers Journal >Government urged to fully'fund HPL cladding removal
【24h】

Government urged to fully'fund HPL cladding removal

机译:政府敦促完全填补HPL包层拆除

获取原文
获取原文并翻译 | 示例
           

摘要

AFTER THE government recently revealed the risks of high pressure laminate (HPL) cladding when partnered with combustible insulation, leaseholders have demanded removal funding. Recently, the government undertook a fire test with the FPA of a particular combination of HPL cladding and insulation, and even though this particular combination passed, the Ministry of Housing, Communities and Local Government (MHCLG) has warned that action must be taken 'as soon as possible' to make HPL panels safe, 'particularly' if used on buildings with combustible insulation.
机译:政府最近透露了高压层压板(HPL)包层的风险,当与可燃绝缘合作时,租赁符要求拆迁资金。最近,政府对HPL包层和绝缘的特定组合的FPA进行了消防试验,即使这种特殊的组合通过,住房,社区和地方政府(MHCLG)都要求采取行动'如果在具有可燃绝缘的建筑物上使用的建筑物,请尽快使HPL面板安全,“特别”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号