...
首页> 外文期刊>Euroheat & Power >Key Hub in Future European CO_2-Pipeline
【24h】

Key Hub in Future European CO_2-Pipeline

机译:未来欧洲CO_2管道的关键枢纽

获取原文
获取原文并翻译 | 示例

摘要

A new EU plan includes Denmark .as one of the key hub in a 17,900 km long pipeline-network to carry CO_2-emission to a carbon capture storage system (CCS) under the North Sea. With a 17,900 km long pipeline and 2,515 km long ship route, the North Sea will become a gigantic storage for the CO_2-emission from the majority of the energy and industry sector in the EU. That is the purpose of a new giant infrastructure that will be built up from scratch within the next decades, if the EU-countries want to be capable of gathering the CO_2-pol-lution from the coal plants and industry and store it in offshore storages alongside the coasts.
机译:一项新的欧盟计划将丹麦作为丹麦的重要枢纽之一,该管道长17900公里,可将CO_2的排放量输送到北海下的碳捕获存储系统(CCS)。北海拥有17900公里长的管道和2515公里长的航线,北海将成为欧盟大多数能源和工业部门的巨大CO_2排放储存库。如果欧盟国家希望能够从燃煤电厂和工业中收集CO_2污染并将其存储在海上存储中,那么这将是在未来几十年内从头开始构建新的巨型基础设施的目的。沿着海岸。

著录项

  • 来源
    《Euroheat & Power 》 |2011年第1期| p.11| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号