首页> 外文期刊>Erdol Erdgas Kohle >Optimizing the Adsorption System of an Underground Gas Storage
【24h】

Optimizing the Adsorption System of an Underground Gas Storage

机译:优化地下储气库的吸附系统

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The adsorption plant will be the first plant at VNG where the natural gas is dried and higher hydrocarbons are removed. This process as such can technically be well handled and is readily applicable. The optimization of the operating parameters of this plant shall be done only during its operation. The aim is to decrease the process costs based on optimized process procedures. As a first result, the thesis presented here as an outline provides approaches for determining the parameters that are suitable for optimization from the present view.
机译:吸附装置将是VNG的第一座装置,该装置将干燥天然气并除去高级烃。这样的过程在技术上可以很好地处理并且易于应用。该设备的运行参数的优化只能在其运行期间进行。目的是基于优化的过程规程降低过程成本。作为第一个结果,本文作为概述提出的论文提供了从当前角度确定适合于优化的参数的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号