首页> 外文期刊>Environmental Technology >Decentralized wastewater treatment in an urban setting: a pilot study of the circulating fluidized bed bioreactor treating septic tank effluent
【24h】

Decentralized wastewater treatment in an urban setting: a pilot study of the circulating fluidized bed bioreactor treating septic tank effluent

机译:城市环境中分散的废水处理:循环流化床生物反应器治疗化粪池流出物的试验研究

获取原文
获取原文并翻译 | 示例
       

摘要

To meet the increasing wastewater treatment demand while minimizing the land footprint of the treatment systems and plants, more efficient and compact processes are needed. The circulating fluidized bed bioreactor (CFBBR) has been proven to achieve high levels of biological nutrient removal. Past studies at the lab and pilot scale achieved 94% COD removal and 80% nitrogen removal at HRT's of 2-4 h. A collaborative project between Western University and the Guangzhou Institute of Energy Conversion (GIEC), in Guangzhou, China, further explored the treatment of municipal wastewater with the CFBBR. A pilot CFBBR, with aerobic and anoxic columns for nitrification and denitrification, was constructed at the GIEC for in-situ treatment of septic tank effluent from a residential building. Due to high concentrations of ammonia (NH4-N), the wastewater had a COD/N ratio of 2-3. Thus, operating at a longer HRT and supplementing COD, in the form of glucose, was necessary to achieve a high nitrogen removal efficiency. The system was run both with and without supplemental COD at HRT's between 16 and 21 h, treating approximately 1000-1270 L/d. Overall, a COD removal efficiency of at least 92%, ammonia removal of 97%, and nitrogen removal of 82% was achieved. The CFBBR system achieved an effluent with BOD and NH4-N concentrations both below 5 mg/L, a NO3-N concentration below 15 mg/L, and a total nitrogen concentration below 25 mg/L. The compact design of this pilot-CFBBR, coupled with its high BNR performance make it an excellent option for decentralized treatment of urban wastewaters.
机译:为了满足日益增加的污水处理需求,同时最小化处理系统和工厂的土地占用,需要更有效和更紧凑的过程。循环流化床生物反应器(CFBBR)已被证明实现高水平的生物脱氮除磷的。在实验室和中试规模过去的研究在HRT的的2〜4小时达到94%的COD去除率和80%氮的去除。西部大学和能量转化的广州研究所(GIEC),在中国广州之间的合作项目,进一步探索城市生活污水与CFBBR治疗。导频CFBBR,与硝化和反硝化的需氧和缺氧列,但在杰科构建了用于在原位从住宅建筑物处理化粪池流出物的。由于高浓度的氨(NH4-N)的,废水具有2-3 COD / N比。因此,在一个较长的HRT操作和补充COD,在葡萄糖的形式,是必要的,以实现高的脱氮效率。该系统具有和不补充COD在HRT的16之间21小时运行,治疗约1000至1270年的L / d。总体而言,至少92%的COD去除率,氨去除的97%,和除氮的82%被达到。所述CFBBR系统来实现的流出物与BOD和NH4-N的浓度均低于5毫克/升,一个NO3-N浓度低于15毫克/升,以及低于25mg / L的总氮浓度。这个试点CFBBR紧凑的设计,再加上其高BNR性能使其成为城市污水的分散处理一个很好的选择。

著录项

  • 来源
    《Environmental Technology》 |2021年第12期|1911-1921|共11页
  • 作者单位

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Univ Western Ontario London ON N6A 3K7 Canada;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China;

    Univ Western Ontario London ON N6A 3K7 Canada;

    Chinese Acad Sci Guangzhou Inst Energy Convers Guangzhou 510640 Guangdong Peoples R China|CAS Key Lab Renewable Energy Guangzhou 510640 Guangdong Peoples R China|Guangdong Prov Key Lab New & Renewable Energy Res Guangzhou 510640 Guangdong Peoples R China|Univ Western Ontario London ON N6A 3K7 Canada;

  • 收录信息 美国《科学引文索引》(SCI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Biological nutrient removal; attached growth process; high-efficiency process; decentralized treatment; in-situ treatment;

    机译:生物养分去除;附加生长过程;高效过程;分散治疗;原位治疗;
  • 入库时间 2022-08-19 02:02:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号