...
首页> 外文期刊>Environmental quality management >Reducing public participation in a formal procedure: Limits of public meetings concerning the installation of the dams of the Madeira River (Brazilian Amazon)
【24h】

Reducing public participation in a formal procedure: Limits of public meetings concerning the installation of the dams of the Madeira River (Brazilian Amazon)

机译:减少公众参与正式程序:关于安装马德拉河大坝的公共会议限制(巴西亚马逊)

获取原文
获取原文并翻译 | 示例

摘要

This article examines and discusses problems faced by proposals to increase participation by members of the public in the public debate process related to environmental policies. The analysis is based on an examination of the processes followed to develop several public meetings, which were ostensibly aimed at democratizing the process of implementing hydroelectric installations in the Madeira River in the Brazilian Amazon at the beginning of the twenty-first century. The analysis concluded that the invitation to the public to participate in discussions regarding the construction of the dams was a mere formality. Not only did members of the public not have access to information that could have helped them understand the real social and environmental impacts of this large-scale economic development project, but the public was restricted from interfering in its construction. As a consequence, the region is today dealing with a number of difficulties which could have been avoided if the voice of the community had been heard in the public meetings.
机译:本文审查并讨论了提案所面临的问题,以增加公众在与环境政策有关的公开辩论进程中的参与。分析基于对发展若干公开会议的过程的审查,这方面旨在使在二十一世纪初在巴西亚马逊的马德拉河河流中实施水电装置的过程。分析得出结论认为,对公众参与讨论的邀请是一个仅仅是一个形式。不仅公众的成员无法获得可能有助于他们了解这一大型经济发展项目的真正社会和环境影响的信息,但公众受到干扰的影响。因此,该地区今天涉及许多困难,如果社区的声音在公开会议中听到了社区的声音。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号