...
首页> 外文期刊>Environmental Pollution >Assessing uncertainty in pollutant build-up and wash-off processes
【24h】

Assessing uncertainty in pollutant build-up and wash-off processes

机译:评估污染物堆积和冲洗过程的不确定性

获取原文
获取原文并翻译 | 示例

摘要

Assessing build-up and wash-off process uncertainty is important for accurate interpretation of model outcomes to facilitate informed decision making for developing effective stormwater pollution mitigation strategies. Uncertainty inherent to pollutant build-up and wash-off processes influences the variations in pollutant loads entrained in stormwater runoff from urban catchments. However, build-up and wash-off predictions from stormwater quality models do not adequately represent such variations due to poor characterisation of the variability of these processes in mathematical models. The changes to the mathematical form of current models with the incorporation of process variability, facilitates accounting for process uncertainty without significantly affecting the model prediction performance. Moreover, the investigation of uncertainty propagation from build-up to wash-off confirmed that uncertainty in buildup process significantly influences wash-off process uncertainty. Specifically, the behaviour of particles <150 mu m during build-up primarily influences uncertainty propagation, resulting in appreciable variations in the pollutant load and composition during a wash-off event. (C) 2016 Elsevier Ltd. All rights reserved.
机译:评估堆积和冲刷过程的不确定性对于准确解释模型结果,促进做出明智的决策以制定有效的雨水污染缓解策略至关重要。污染物积聚和冲洗过程固有的不确定性会影响城市集水区雨水径流夹带的污染物负荷变化。然而,由于数学模型中这些过程的可变性表征不佳,来自雨水质量模型的堆积和冲刷预测不能充分代表这种变化。当前模型的数学形式的变化(包含过程可变性)有助于在不显着影响模型预测性能的情况下考虑过程不确定性。此外,对从堆积到冲洗的不确定性传播的研究证实,堆积过程中的不确定性会显着影响冲洗过程的不确定性。具体而言,在堆积过程中小于150微米的颗粒的行为主要影响不确定性的传播,从而在冲洗过程中导致污染物负荷和成分的明显变化。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号