【24h】

Notices

机译:告示

获取原文
获取原文并翻译 | 示例
           

摘要

EPA Regions 1, 2, 3, 5, 6, 7, 8, 9, and 10 extended until February 15, 2012, the expiration date of the 2008 NP-DES general permits for stormwater discharges associated with construction activity. 76 FR 40355 (7/8/11).EPA entered into a proposed consent decree in Kentucky Environmental Foundation v. Jackson, No. 10-CV-1814-PLF (D.D.C.), that establishes March 30, 2012, as the deadline for the Agency to take action on Kentucky's SIP for the 1997 fine PM NAAQS for the Huntington-Ashland nonattainment area. 76 FR 45562 (7/29/11).EPA entered into a proposed consent decree in Sierra Club v. Jackson, No. 11-cv-36-SLC (W.D. Wis.), that requires the Agency to respond to a petition seeking its objection to a CAA Title V operating permit for a lime kiln facility in Manitowoc, Wisconsin, by October 7, 2011. 76 FR 45564 (7/29/11).
机译:EPA地区1、2、3、5、6、7、8、9和10延长至2012年2月15日,这是与建筑活动相关的2008年NP-DES雨水排放通用许可证的有效期。 76 FR 40355(7/8/11).EPA在肯塔基州环境基金会诉Jackson案(No. 10-CV-1814-PLF(DDC))中订立了拟议的同意法令,该法令规定2012年3月30日为截止日期原子能机构将针对肯塔基州的SIP采取行动,以应对1997年亨廷顿-阿什兰不达标地区的罚款NAAQS。 76 FR 45562(7/29/11).EPA在Sierra Club诉Jackson案中(第11-cv-36-SLC号判决,WD Wis。)达成了一项拟议的同意法令,要求EPA对请求书进行回应反对在2011年10月7日之前对位于威斯康星州马尼托瓦克的石灰窑设施实施CAA第五章操作许可证。76 FR 45564(7/29/11)。

著录项

  • 来源
    《The Environmental Law Reporter》 |2011年第9期|p.10859-10860|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号