In order to make a reasonable evaluation of the effect of backfill mining on non-coal mines, the first phase of the Laixin iron ore mine project is taken as an example. First, a geomechanical model of iron ore mining was established according to geological theory; second, numerical simulation software FLAC3D was used to analyze the surface subsidence, horizontal displacement, plastic failure range of the surrounding rocks, and stress conditions of the surface and surrounding rocks under unfilled and filled conditions; finally, the observation data of surface subsidence in the open area were analyzed against the background of the Phase I mining project of Laixin iron ore mine. The results show that: (1) the amount of surface subsidence increases with the increase of burial depth. As the mining depth increases, the amount of ground subsidence gradually increases. (2) Numerical simulation of the amount of surface subsidence and horizontal displacement in the unfilled condition is ten times that in the filled condition; the plastic zone of destruction in the unfilled condition extends to the surface, and the plastic destruction in the filled condition is mainly in the vicinity of the mining location, and the vertical stress in the unfilled condition is much larger than that in the filled condition; (3) the on-site measured results are basically consistent with the numerical simulation results, and the numerical simulation can be used to reasonably predict the amount of subsidence and horizontal displacement of the ground surface, and the force on the goaf.
机译:为了合理评估回填矿井对非煤矿的影响,作为示例采用了Laixin铁矿石项目的第一阶段。首先,根据地质理论建立了铁矿石挖掘的地质力学模型;其次,使用数值模拟软件FLAC3D分析了周围岩石的表面沉降,水平位移,塑料失效范围,以及在未填充和填充条件下的表面和周围岩石的应力条件;最后,分析了开放区域地表沉降的观察数据,以防止莱文铁矿石矿山矿业项目的背景。结果表明:(1)表面沉降量随着埋藏深度的增加而增加。随着采矿深度的增加,地面沉降量逐渐增加。 (2)未填充条件下的表面沉降量和水平位移量的数值模拟是填充条件的十倍;未填充状态的破坏区域延伸到表面,并且填充条件的塑性破坏主要在采矿位置附近,未填充条件下的垂直应力远大于填充条件的垂直应力; (3)现场测量结果基本上与数值模拟结果一致,数值模拟可用于合理地预测地面的沉降量和水平位移,以及GOAF上的力。

著录项

  • 来源
    《Environmental earth sciences》 |2021年第16期|505.1-505.24|共24页
  • 作者单位

    Shandong Univ Sci & Technol Coll Energy & Min Engn Qingdao 266590 Shandong Peoples R China|Shandong Univ Sci & Technol State Key Lab Mine Disaster Prevent & Control Qingdao 266590 Shandong Peoples R China;

    Shandong Univ Sci & Technol Coll Energy & Min Engn Qingdao 266590 Shandong Peoples R China|Shandong Univ Sci & Technol State Key Lab Mine Disaster Prevent & Control Qingdao 266590 Shandong Peoples R China;

    Shandong Univ Sci & Technol Coll Energy & Min Engn Qingdao 266590 Shandong Peoples R China|Shandong Univ Sci & Technol State Key Lab Mine Disaster Prevent & Control Qingdao 266590 Shandong Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Mine Disaster Prevent & Control Qingdao 266590 Shandong Peoples R China|Shandong Univ Sci & Technol Coll Safety & Environm Engn Qingdao 266590 Shandong Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Mine Disaster Prevent & Control Qingdao 266590 Shandong Peoples R China|Shandong Univ Sci & Technol Coll Safety & Environm Engn Qingdao 266590 Shandong Peoples R China;

    Laiwu Laixin Iron Ore Co Ltd Jinan 266590 Shandong Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Computational analysis; Numerical simulation; Ground subsidence; Horizontal displacement; Plastic failure; Field observation;

    机译:计算分析;数值模拟;地面沉降;水平位移;塑料失效;现场观察;