首页> 外文期刊>Environmental earth sciences >Runoff and sediment yield modeling by means of WEPP in the Bautzen dam catchment, Germany
【24h】

Runoff and sediment yield modeling by means of WEPP in the Bautzen dam catchment, Germany

机译:利用WEPP在德国包岑大坝流域进行径流和泥沙产量模拟

获取原文
获取原文并翻译 | 示例
           

摘要

Soil erosion by water is one of the most widespread forms of soil degradation in Europe. There are many undesirable consequences of soil erosion due to water such as loss of water storage capacity in reservoirs and transfer of pollutants from farmland to water bodies. The objectives of this study were to calibrate and validate the Water Erosion Prediction Project watershed model (WEPP 2012.8) in the Bautzen dam catchment area with monthly and daily single events for runoff and sediment yield. This is to our knowledge the first study using WEPP in Germany. The catchment (310 km~2) was subdivided into small sub-catchments with an area of <260 ha as recommended in WEPP. A sensitivity analysis revealed that the runoff is highly sensitive to the effective hydraulic conductivity in Bautzen, whereas the sediment yield is highly sensitive to rill erodibility, critical shear stress, and to the effective hydraulic conductivity as well. All these parameters were initially calculated using WEPP's built-in equations and parameters, which, however, produced very poor results for both runoff and sediment yield. Therefore, the model was calibrated for 2 years (2005-2007) and validated for another 2 years (2008-2009) against monthly measurements, in addition to 14 daily single events from the calibration period and 2010. The monthly results were compared with the monthly measurements on the basis of a continuous simulation. Results of calibration and validation periods show a satisfactory performance of WEPP with a determination coefficient R~2 above 0.6 and Nash-Sutcliffe efficiency coefficients above 0.50 for runoff and sediment yield. Thus, the model could be used to simulate runoff and sediment yield, and used in scenario studies in the Bautzen dam catchment area.
机译:水土流失是欧洲最普遍的土壤退化形式之一。由于水造成的土壤侵蚀有许多不良后果,例如水库中储水能力的损失以及污染物从农田向水体的转移。这项研究的目的是校准和验证包岑水坝集水区的水蚀预报项目分水岭模型(WEPP 2012.8),该分析具有径流和沉积物产量的每月和每日单个事件。据我们所知,这是德国首次使用WEPP进行的研究。根据WEPP的建议,将集水区(310 km〜2)细分为面积小于260公顷的小型集水区。敏感性分析表明,径流对包岑的有效水力传导率高度敏感,而泥沙产量对钻头的侵蚀性,临界切应力以及有效水力传导率高度敏感。所有这些参数最初都是使用WEPP的内置方程式和参数来计算的,但是,这对于径流和沉积物产量均产生了非常差的结果。因此,除了从校准期到2010年的14天每日单事件外,还对模型进行了2年(2005-2007年)的校准,并针对另外2年(2008-2009年)对月度测量进行了验证。在连续模拟的基础上进行每月测量。校准和验证期的结果表明,WEPP的性能令人满意,其径流和沉积物产量的测定系数R〜2大于0.6,Nash-Sutcliffe效率系数大于0.50。因此,该模型可用于模拟径流和沉积物产量,并用于包岑大坝集水区的情景研究。

著录项

  • 来源
    《Environmental earth sciences》 |2014年第6期|2051-2063|共13页
  • 作者单位

    Hydrogeologie Department, Technische Universitaet Bergakademie Freiberg, Gustav Zeuner Str. 12, 09599 Freiberg, Germany,Building and Construction Engineering Department, University of Technology, Baghdad, Iraq;

    Hydrogeologie Department, Technische Universitaet Bergakademie Freiberg, Gustav Zeuner Str. 12, 09599 Freiberg, Germany;

    Hydrogeologie Department, Technische Universitaet Bergakademie Freiberg, Gustav Zeuner Str. 12, 09599 Freiberg, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Bautzen catchment area; WEPP; Calibration; Runoff; Sediment yield;

    机译:包岑集水区;WEPP;校准;径流;泥沙产量;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号