...
首页> 外文期刊>Environmental engineering and management journal >WASTEWATER AND BIOGAS PRODUCTION IN KATHMANDU VALLEY, NEPAL: CHALLENGES AND OPPORTUNITIES
【24h】

WASTEWATER AND BIOGAS PRODUCTION IN KATHMANDU VALLEY, NEPAL: CHALLENGES AND OPPORTUNITIES

机译:加德满都谷,尼泊尔的废水和沼气生产:挑战和机遇

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Kathmandu valley, the country's most urbanized city, is expected to deal with an estimated 200 million liters per day (MLD) of wastewater at the completion of the Melamchi Water Supply Project. In this paper, we review the history, present, and future prospects of the wastewater treatment plants (WWTPs) as well as estimate the total biogas potential of the expected wastewater through anaerobic digestion using the chemical oxygen demand (COD) mass balance approach. The total biogas potential from the expected 200 MLD wastewater with an average COD concentration of 1000 +/- 225 mg/L, was estimated to be 23105 +/- 5185Nm(3)/day which is equivalent to a total electricity potential of 3.35 +/- 0.76 megawatt (MW). Thus produced bioenergy can be utilized to supply the energy demand of the treatment plants, support the plants to be less dependent on the grid energy-thereby helping to achieve energy self-sufficiency, achieve cleaner urban rivers, and possibly also reduce greenhouse gas emissions from the plants. This study also encourages timely construction and completion of energy self-sufficient treatment plants around the country.
机译:该国最城市化城市的加德满都山谷预计将在梅拉米国际供水项目完成时对污水估计为每天2亿升(MLD)。在本文中,我们审查了废水处理厂(WWTPS)的历史,现在和未来前景,以及使用化学需氧量(COD)质量平衡方法通过厌氧消化来估计预期废水的总沼气潜力。总沼气从电位预期的200 MLD废水1000 +/- 225毫克/升的平均COD浓度,估计为23105 +/- 5185Nm(3)/天这相当于3.35总电势+ / - 0.76兆瓦(MW)。由此生产的生物能量可用于提供治疗厂的能量需求,支持植物的依赖于栅格能量 - 从而有助于实现能源自给自足,实现更清洁的城市河流,也可能还减少温室气体排放植物。本研究还鼓励及时建设和完成全国能源自给疗养厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号