...
首页> 外文期刊>Environment reporter >Washington State Asks NRC to Clarify Order Terminating Work on Yucca Mountain Site
【24h】

Washington State Asks NRC to Clarify Order Terminating Work on Yucca Mountain Site

机译:华盛顿州要求NRC澄清丝兰山遗址的订单终止工作

获取原文
获取原文并翻译 | 示例
           

摘要

Washington state asked the Nuclear Regulatory Commission Sept. 12 to clarify the meaning of a vote and subsequent order on the fate of a license application for a planned nuclear waste repository at Yucca Mountain, Nev. A 2-2 vote by four members of the commission Sept. 9 on the future of the license and a concomitant order filed with the U.S. Court of Appeals for the District of Columbia Circuit calling a halt to all work conducted by NRC's licensing board is "contradictory," Andrew A. Fitz, senior counsel for the Washington attorney general, said in a Sept. 12 letter to NRC's general counsel.
机译:华盛顿州要求核监管委员会9月12日澄清一票的含义,以及随后对内华达州尤卡山一个计划中的核废料处置库的许可证申请的命运的命令。该委员会的四名成员以2票对2票进行了投票。 9月9日,关于许可证的未来,并向美国上诉法院提交了哥伦比亚特区巡回法院的命令,要求中止NRC许可委员会进行的所有工作是“矛盾的”,高级律师Andrew A. Fitz华盛顿州检察长在9月12日给NRC总法律顾问的信中说。

著录项

  • 来源
    《Environment reporter》 |2011年第36期|p.2073|共1页
  • 作者

    Pat Ware;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号