...
首页> 外文期刊>Environment reporter >Xcel Energy of Colorado Reaches Settlement Clearing Way for Large Wind Project
【24h】

Xcel Energy of Colorado Reaches Settlement Clearing Way for Large Wind Project

机译:科罗拉多州的Xcel Energy达成大型风电项目的结算清算方式

获取原文
获取原文并翻译 | 示例

摘要

Xcel Energy has reached a settlement with multiple parties clearing the way for the construction of one of the largest wind farms in Colorado to begin this year. The administrative settlement, reached Sept. 6, obviates a hearing scheduled to occur before the Colorado Public Utilities Commission and means Xcel can proceed on an earlier construction schedule for the $1 billion Rush Creek Wind Project. The settlement included the company, commission staff, other utilities and environmental groups.
机译:Xcel Energy已与多方达成和解,为今年开始在科罗拉多州建设最大的风电场之一扫清了道路。这项行政和解协议已于9月6日达成,避免了原定在科罗拉多州公用事业委员会举行的听证会,这意味着Xcel可以按照较早的计划进行耗资10亿美元的Rush Creek Wind Project的建设。解决方案包括公司,委托人员,其他公用事业和环保组织。

著录项

  • 来源
    《Environment reporter 》 |2016年第36期| 2606-2606| 共1页
  • 作者

    Tripp Baltz;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号