...
首页> 外文期刊>Environment reporter >Georgia, Army Corps Notch Win in Row Over Atlanta Water Supply
【24h】

Georgia, Army Corps Notch Win in Row Over Atlanta Water Supply

机译:格鲁吉亚,陆军军团陷入困境,亚特兰大供水

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Army Corps of Engineers can avoid a challenge by Alabama and wildlife groups to its decision to grant Georgia’s request and allocate sufficient water to ensure Atlanta’s water supplyneeds until the year 2050, a Georgia federal court ruled.The Corps operates the Lake Lanier reservoir, which is formed by the Buford Dam. Georgia asked the Corps to modify its operation of the project to facilitate withdrawal from the reservoirand downstream. That request was granted after the Corps found it could be done without a major change to operations.The Corps didn’t need congressional approval to accommodate Georgia’s water supply request under the Water Supply Act, according to the U.S. District Court for the Northern District ofGeorgia.
机译:工程师的陆军军团可以避免阿拉巴马州和野生动物群体的挑战,以决定授予格鲁吉亚的要求,并分配足够的水,以确保亚特兰大的供水 在2050年的佐治亚联邦法院裁定到2050年。 军团运营Lake Lanier水库,由布福德大坝形成。 格鲁吉亚要求军团修改其项目的运作,以促进储层撤回 和下游。 该请求被授予在兵团发现它可以在没有重大变革的情况下进行。 根据美国地区法院的北部地区美国地区法院的说法,该军团不需要国会批准,以便在供水法下适应佐治亚州的供水要求 乔治亚州。

著录项

  • 来源
    《Environment reporter》 |2021年第8期|1-2|共2页
  • 作者

    MAYA EARLS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号