首页> 外文期刊>Environment reporter - Cases >Valbruna Slater Steel Corp. v. Joslyn Mfg. Co.
【24h】

Valbruna Slater Steel Corp. v. Joslyn Mfg. Co.

机译:Valbruna Slater Steel Corp.诉Joslyn Mfg。Co.

获取原文
获取原文并翻译 | 示例
       

摘要

Current owners of contaminated site incurred over $2 million in recoverable response costs under Comprehensive Environmental Response, Compensation, and Liability Act, because, even though costs incurred to raze melt shop on site, erect vapor barrier under replacement building, conduct studies to ensure worker safety at site, and remove bunker oil tanks and transformer not at risk of leaking did not remediate existing threats from site and are not necessary recoverable costs: (1) commercial motivation is irrelevant to whether costs are necessary response costs and prospective purchaser agreement contributions used for reme diation, site assessments, leaking passivation sump removal, and contaminated soil removal were used to address threats to human health and environment and were incurred consistent with national contin-gency plan, and (2) even though not all costs were included in cost tracking sheets, costs from other sources were substantiated and evidence established costs were necessary and consistent with NCR.
机译:根据《综合环境响应,赔偿和责任法》,受污染场地的当前所有者产生了超过200万美元的可收回响应成本,这是因为,即使在现场烧毁熔体车间,在替换建筑物下架设防潮层而产生的成本,仍需进行研究以确保工人安全在现场,拆除没有泄漏风险的船用燃油箱和变压器,没有从现场补救现有的威胁,也不是可收回的成本:(1)商业动机与成本是否是必要的响应成本和预期的购买方协议捐款无关补救措施,现场评估,渗漏的钝化残渣去除和污染的土壤去除被用于应对对人类健康和环境的威胁,并与国家应急计划相一致,并且(2)即使并非所有成本都包括在成本跟踪中床单,其他来源的成本得到证实,并且没有证据表明已确定的成本必要且与NCR一致。

著录项

  • 来源
    《Environment reporter - Cases》 |2017年第14期|1732-1743|共12页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:06:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号