...
首页> 外文期刊>Environment international >Leaching of nickel and copper from soil contaminated by metallurgical dust
【24h】

Leaching of nickel and copper from soil contaminated by metallurgical dust

机译:从冶金粉尘污染的土壤中浸出镍和铜

获取原文
获取原文并翻译 | 示例
           

摘要

The paper presents the results of the laboratory percolation experiment simulated soil contamination by emissions from a NI-Cu smelter. Humus- (Ao horizon) columns were transferred to lysimeters from an illuvial, humic, ferriferous forest podzol site. Fine metallurgical dust Containing Ni and Cu as layered on the columns and irrigated with sulphuric acid solutions at pH 3, 4, 5, and 6. Irrigation for 19 months Indicated that the leaching of metals down the humus column was greatest at pH 6. Calculations indicated that it would take 160-270 years For complete leaching of Ni from the Ao layer, and 100-200 years for Cu, depending one dust composition. Natural decontamination of Affected soils will take centuries.
机译:本文介绍了实验室渗滤实验的结果,模拟了NI-Cu冶炼厂的排放物对土壤的污染。将腐殖质(Ao地平线)色谱柱从一个腐殖质,腐殖质,肥沃的森林Podzol站点转移到溶渗仪中。含Ni和Cu的细粉末冶金粉,在柱上分层,并用pH 3、4、5和6的硫酸溶液灌溉。灌溉19个月表明,在pH 6时,从腐殖质柱上的金属浸出最大。指出从一个Ao层中完全浸出镍需要160-270年,而从Cu浸出需要100-200年,这取决于一种粉尘的成分。对受影响的土壤进行自然净化需要几个世纪的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号