首页> 外文期刊>Engineers Australia >Keeping the electricity network humming
【24h】

Keeping the electricity network humming

机译:保持电网嗡嗡作响

获取原文
获取原文并翻译 | 示例
       

摘要

Michael Verrier's typical day as an operations support officer at Transcend Networks begins at 8:45am at the electricity transmission utility's offices at Lenah Valley, in Hobart. He starts his day by reviewing the work of colleagues and checking to see if the control room personnel have identified any irregularities with Transcend's energy management system (EMS). He said the EMS involves setup and ongoing maintenance of the state estimator, power flow, contingency analysis and operator training simulator tools. However, he pointed out that one of the most important aspects of the first hour of work is that the forthcoming day's work is properly prioritised and allocated.
机译:Michael Verrier在Transcend Networks担任运营支持人员的典型一天是上午8:45在霍巴特Lenah Valley的输电公司的办公室开始。他的工作开始于回顾同事的工作,并检查控制室人员是否已通过创见的能源管理系统(EMS)发现了任何违规行为。他说,EMS涉及状态估计器的设置和持续维护,功率流,应变分析和操作员培训模拟器工具。但是,他指出,第一个小时工作的最重要方面之一是正确安排和分配即将到来的一天的工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号