首页> 外文期刊>Engineers Australia >Rail upgrade being considered
【24h】

Rail upgrade being considered

机译:正在考虑铁路升级

获取原文
获取原文并翻译 | 示例
       

摘要

Calibre Engenium has the engineering, procurement and construction management contract for the rail portion of the Rapid Growth Project 5. The project, currently being considered by BHP Billiton, involves building a second 270km track between the Yandi iron ore mine and Port Hedland, and expanding the latter's inner harbour. "The core of the Pilbara is progressively moving to the Yandi/Area C mining hubs. Double tracking the rail to this area will create the rail capacity to support our planned expansion to more than 300Mt/a," president of BHP Billiton Iron Ore Ian Ashby said in February. Calibre Engenium was originally engaged in June 2007 to complete a preliminary engineering study. The company is a project management and engineering consultancy owned by Calibre Rail and Engenium. Currently, work is focusing on procuring long lead times.
机译:Calibre Engenium拥有快速增长项目5铁路部分的工程,采购和施工管理合同。该项目目前由必和必拓考虑,涉及在Yandi铁矿和黑德兰港之间建造第二条270公里的轨道,并进行扩建后者的内港。必和必拓铁矿石公司Ian总裁表示:“皮尔巴拉(Pilbara)的核心正在逐步转移到Yandi / Area C矿山枢纽。对这条区域的铁路进行两次跟踪将产生铁路运输能力,以支持我们计划将其扩建至300Mt / a以上,”必和必拓铁矿石公司Ian总裁阿什比在二月份说。 Calibre Engenium最初于2007年6月聘请完成初步的工程研究。该公司是Calibre Rail and Engenium旗下的项目管理和工程咨询公司。当前,工作重点是延长交货时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号