首页> 外文期刊>Engineers Australia >Upgrade for key Hunter Water pump station
【24h】

Upgrade for key Hunter Water pump station

机译:升级关键的猎人水泵站

获取原文
获取原文并翻译 | 示例
       

摘要

Balickera Pump Station, an integral component of Hunter Water's Gra-hamstown water storage system, is being upgraded. The pump station extracts water from the Williams River at Seaham Weir and pumps it several kilometres via an open canal to the Balickera Pump Station. The water is then lifted 13m via six pumps and then gravity fed a further 5km, via open canal and tunnel, to Grahamstown Dam. The current system can transfer 1350ML/d.
机译:Balickera泵站是Hunter Water的Gra-hamstown储水系统的组成部分,正在升级中。抽水站从西汉姆威尔的威廉姆斯河抽取水,并通过一条开放的运河将其抽水数公里到巴利卡抽水站。然后通过六个泵将水提升13m,然后重力通过开放的运河和隧道将其进一步输送5公里,到达Grahamstown大坝。当前系统可以传输1350ML / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号