首页> 外文期刊>Engineers Australia >Upgrade At Bengalla Coal
【24h】

Upgrade At Bengalla Coal

机译:孟加拉煤矿升级

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Mining services firm Sedgman last month secured a $25 million plus contract from Rio Tinto Coal Australia (RTCA) to design and construct an upgrade to the coal handling and preparation plant (CHPP) at Bengalla Coal Mine, 3km west of Muswellbrook in the upper Hunter Valley.rnSedgman Coal's chief operating officer Steve van Barneveld said Sedgman had been involved at Bengalla since winning the original CHPP contract in early 1997 and was awarded the upgrade contract through a direct negotiation process.rnThe Bengalla CHPP was designed and built by Sedgman and first commissioned in March 1999. Sedgman has since provided ongoing support for RTCA and Bengalla Mining Company, completing many upgrade projects on the site.
机译:矿业服务公司Sedgman上个月从澳大利亚力拓煤炭公司(RTCA)获得了一份2500万美元的合同,以设计和建造位于猎人谷上游Muswellbrook以西3公里处的Bengalla煤矿的煤炭处理和选煤厂(CHPP)。塞格曼煤炭公司的首席运营官史蒂夫·范·巴内维尔德(Steve van Barneveld)表示,塞格曼煤矿自1997年初赢得原始CHPP合同以来就参与其中,并通过直接谈判程序获得了升级合同。 1999年3月,Sedgman为RTCA和Bengalla矿业公司提供了持续的支持,并完成了该站点上的许多升级项目。

著录项

  • 来源
    《Engineers Australia》 |2009年第1期|39|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号