首页> 外文期刊>Engineers Australia >Massive mine expansion a step closer
【24h】

Massive mine expansion a step closer

机译:大规模矿山扩张近了一步

获取原文
获取原文并翻译 | 示例
           

摘要

After the proposed expansion of Olympic Dam mine received approval under federal environmental law last month, BHP Billiton approved $1.2 billion in precommitment capital for the first phase of the project to develop an open pit mine in South Australia. The funding will facilitate the procurement of long lead items such as trucks and accommodation, infrastructure development and early site works. The mine has potential to increase production to 750,000t/a of refined copper plus associated products (uranium oxide, gold and silver), nearly four times its current output. The International Copper Study Group said the world copper mine production has passed 16Mt/a in 2010. In May, BHP Billiton marketing president Mike Henry said copper demand between now and 2025 is forecast to grow 1.7 times the current rate - with particularly high growth forecast in China and India. Hence, BHP Billiton seeks to expand Olympic Dam to meet some of this forecast new demand. BHP Billiton chief executive officer Marius Kloppers said: "The precommitment funding is another important milestone in the development of this world class ore-body."
机译:提议的扩建奥林匹克大坝矿井在上个月根据联邦环境法获得批准后,必和必拓批准了12亿美元的预承诺资本,用于该项目的第一阶段,以在南澳大利亚开发露天矿。这笔资金将有助于采购长铅项目,例如卡车和住宿,基础设施开发和早期现场工作。该矿有潜力将精炼铜及相关产品(氧化铀,金和银)的产量提高到75万吨/年,几乎是目前产量的四倍。国际铜业研究组织(International Copper Study Group)表示,2010年世界铜矿产量已超过16Mt /a。5月,必和必拓营销总裁Mike Henry表示,从现在到2025年,铜需求预计将增长当前速度的1.7倍-增长预测尤其高在中国和印度。因此,必和必拓力求扩建奥林匹克大坝,以满足部分预计的新需求。必和必拓首席执行官马里乌斯·克洛珀斯(Marius Kloppers)表示:“预先承诺资金是这个世界级矿体发展中的另一个重要里程碑。”

著录项

  • 来源
    《Engineers Australia》 |2011年第11期|p.10-11|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号