...
【24h】

Barry Broe

机译:巴里·布鲁

获取原文
获取原文并翻译 | 示例
           

摘要

In the first year since being appointed coordinator-general, Barry Broe has already made 145 statutory decisions, an increase of 225% over the previous 12 month period. One of his main focusses is streamlining project assessment timeframes; a direct result has been the reduction of assessment times of the environmental impact process by 60%. Among the projects approved by Broe are the $6.5 billion Alpha Coal project (a 30Mt/a open-cut coal mine) and the $1.45 billion South of Embley project (a staged increase of Rio Tinto Alcans Weipa bauxite mining operation to 50Mt/a, including a new open-cut mine).
机译:自被任命为总协调员以来的第一年,Barry Broe已作出145项法定决定,比前12个月增加了225%。他的主要重点之一是简化项目评估的时间表。直接结果是将环境影响过程的评估时间减少了60%。 Broe批准的项目包括价值65亿美元的Alpha Coal项目(一座30Mt / a露天煤矿)和价值14.5亿美元的Embry South项目(Rio Tinto Alcans Weipa铝土矿的分阶段开采作业增加至50Mt / a,包括一个新的露天矿)。

著录项

  • 来源
    《Engineers Australia》 |2013年第6期|70-70|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号