首页> 外文期刊>Engineers Australia >Engineers collaborate with architects
【24h】

Engineers collaborate with architects

机译:工程师与建筑师合作

获取原文
获取原文并翻译 | 示例
       

摘要

The newest ferry terminal to open in Brisbane since the destructive 2011 floods incorporates design elements to safeguard it from a similar disaster. The Milton Ferry Terminal opened in January and was designed by Aurecon and Cox Raynor Architects. The two firms were commissioned following their winning entry into a Brisbane ferry terminal design competition following the flood three years ago. Among the terminal's flood resilience features is the pier's base, shaped like a boat's hull, which allows floodwaters and debris to easily flow past.
机译:自2011年毁灭性洪水以来,布里斯班开放的最新渡轮码头采用了设计元素,以保护其免受类似灾难的影响。 Milton轮渡码头于1月开放,由Aurecon和Cox Raynor Architects设计。在三年前的洪灾之后,这两家公司获胜参加了布里斯班轮渡码头设计竞赛,因此受到委托。码头的防洪能力是码头的底部,其形状像小船的船体,可让洪水和碎屑轻松流过。

著录项

  • 来源
    《Engineers Australia》 |2015年第1期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:34:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号