首页> 外文期刊>Engineering news-record >CHICAGO UTILITY BREATHES EASIER WITH RELIABILITY IMPROVEMENTS
【24h】

CHICAGO UTILITY BREATHES EASIER WITH RELIABILITY IMPROVEMENTS

机译:芝加哥公用事业通过可靠性改进提高了便捷性

获取原文
获取原文并翻译 | 示例
           

摘要

Pamela B. Strobel is driven by a nightmare. It's Aug. 12, 1999. The Chicago summer's blistering heat has caused a two-week series of equipment failures resulting in electrical outages. On this day, 3,800 businesses in the Loop, including the Chicago Board of Trade, were darkened. In response, Chicago Mayor Richard M. Daley (D) is angrily condemning her company, electric utility Commonwealth Edison Co., telling a press conference, "We are sick and tired of them, and they had better change."
机译:Pamela B. Strobel陷入噩梦。现在是1999年8月12日。芝加哥夏天的烈热使设备连续两周出现故障,导致断电。在这一天,包括芝加哥贸易委员会在内的卢普地区的3,800家企业都被淡化了。作为回应,芝加哥市市长理查德·戴利(Richard M. Daley)(D)愤怒地谴责了她的电力公司英联邦爱迪生公司(Commonwealth Edison Co.),他在新闻发布会上说:“我们对它们感到厌倦,并且他们有更好的改变。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号