首页> 外文期刊>Engineering news-record >Involving Stakeholders Helps Agency to Find Best Option
【24h】

Involving Stakeholders Helps Agency to Find Best Option

机译:利益相关者的参与帮助机构找到最佳选择

获取原文
获取原文并翻译 | 示例
       

摘要

Like most parts of the country, the Pacific Northwest's power transmission system is stretched to its limits. To deal with it, the Bonneville Power Administration is planning to expand the grid by as much as 155 miles. But at the same time, it is changing its public approach to make sure that construction is the best way to go. To smooth the contentious approval process and find cost-effective solutions to power congestion, the Portland, Ore.-based agency in early 2003 established a roundtable to examine nonconstruction alternatives. It involved potential stakeholders from the beginning. "That we are seriously considering all transmission alternatives...increases the comfort level of stakeholders," says Brian Silverstein, BPA's manager of network planning.
机译:与美国大部分地区一样,西北太平洋的电力传输系统也已达到极限。为了解决这个问题,邦纳维尔电力局计划将电网扩展多达155英里。但是与此同时,它正在改变其公开方式,以确保建设是最好的方式。为了简化有争议的审批流程并找到具有成本效益的电力拥堵解决方案,这家位于俄勒冈州波特兰的机构于2003年初建立了一个圆桌会议,以研究非建筑替代方案。从一开始它就涉及潜在的利益相关者。 BPA网络规划经理Brian Silverstein表示:“我们正在认真考虑所有传输选择,从而提高了利益相关者的舒适度。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号