首页> 外文期刊>Engineering news-record >Mold Fix Puts Expensive End To School District Legal Battle
【24h】

Mold Fix Puts Expensive End To School District Legal Battle

机译:Mold Fix结束了昂贵的学区法律斗争

获取原文
获取原文并翻译 | 示例
           

摘要

Along legal struggle between contractors and a school district near Fresno, Calif., has come to a costly end as an extensive mold abatement project begins this summer at a 10-year-old high school complex. The work follows discovery of the mold in 2000 and an $8.2-million settlement last fall that roughly doubled the value of a defects claim against the contractors, according to sources involved with the case. The insurers for 13 contractors and suppliers subsequently decided to settle.
机译:随着承包商与加利福尼亚州弗雷斯诺附近学区之间法律纠纷的结束,代价昂贵的结局是,今年夏天在一个拥有10年历史的高中综合体中开始了广泛的减少霉菌的项目。据该案的消息来源称,这项工作是在2000年发现该模具之后,去年秋天以820万美元达成了和解,这使针对承包商的缺陷索赔的价值大约翻了一番。 13家承包商和供应商的保险公司随后决定解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号