首页> 外文期刊>Engineering news-record >New LNG Terminal in Gulf Taps Abandoned Mining Site
【24h】

New LNG Terminal in Gulf Taps Abandoned Mining Site

机译:海湾新的LNG接收站挖掘废弃的矿场

获取原文
获取原文并翻译 | 示例
           

摘要

Acting to leapfrog competing projects, a developer filed a plan to the Coast Guard March 1 to build a liquefied natural gas terminal on existing platforms in the Gulf of Mexico close to the mouth of the Mississippi River. If it receives a deepwater port license early next year, New Orleans-based McMoRan Exploration says it can have the proposed Main Pass Energy Hub in service by late 2007. The facility would be able to receive 1 billion cu ft per day of LNG and store up to 28 billion cu ft in a salt dome under the Gulf floor. With the large storage capacity, it will be able to deliver up to 2.5 billion cfd of regasi-fied product to points in Louisiana and Alabama through underwater pipelines.
机译:为了超越竞争项目,开发人员于3月1日向海岸警卫队提交了一项计划,计划在密西西比河河口附近的墨西哥湾现有平台上建造液化天然气终端。总部位于新奥尔良的McMoRan Exploration表示,如果它在明年初获得深水港口许可证,则可以在2007年底之前将拟议的Main Pass能源枢纽投入使用。该设施每天将能够接收10亿立方英尺的LNG和储存海湾底下的一个盐穹顶高达280亿立方英尺。凭借巨大的存储容量,它将能够通过水下管道向路易斯安那州和阿拉巴马州的各个点交付多达25亿立方英尺的常规产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号