首页> 外文期刊>Engineering news-record >Getting Off the Ground
【24h】

Getting Off the Ground

机译:下车

获取原文
获取原文并翻译 | 示例
       

摘要

For the coker modification project at the Golden Eagle Refinery in Martinez, CA, Cherne Contracting Corporation faced a dilemma. While forming the main columns and tie beams of the structure was not a hurdle, constructing and supporting the mid-level and upper-level slabs was a challenge. Cherne wanted the mat foundation to be as free as possible from any obstructions, so they did not want to use conventional shoring methods to support the slabs from the mat. Once Symons provided a solution for this important requirement and several other forming details, it was time to get started. The heavy-duty Max-A-Form forming system was used for the mat foundation, support columns and tie beams. Since Cherne was able to reconfigure the Max-A-Form system for each of these structural elements, they were able to maximize equipment usage and minimize the total amount of equipment needed on the site.
机译:对于加利福尼亚州马丁内斯金鹰炼油厂的焦化改造项目,切尔内合同公司面临两难境地。虽然形成结构的主柱和连接梁不是障碍,但建造和支撑中层和高层楼板是一个挑战。 Cherne希望垫子基础尽可能不受任何障碍物的影响,因此他们不想使用传统的支撑方法从垫子上支撑平板。一旦Symons为这一重要要求和其他几个成型细节提供了解决方案,就该开始了。重型Max-A-Form成型系统用于垫子基础,支撑柱和系梁。由于Cherne能够针对这些结构元素中的每一个重新配置Max-A-Form系统,因此他们能够最大限度地利用设备,并减少现场所需的设备总量。

著录项

  • 来源
    《Engineering news-record》 |2007年第16期|p.c14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:16:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号