首页> 外文期刊>Engineering news-record >Three Runways Open But New Streamlined Rules Stall
【24h】

Three Runways Open But New Streamlined Rules Stall

机译:三条跑道开放但新的简化规则停滞不前

获取原文
获取原文并翻译 | 示例
       

摘要

As three new U.S. runways officially opened Nov. 20, the Federal Aviation Administration bill that would fund airport improvement grants, which would include a more streamlined process for future runway projects, still awaits reauthorization. The runways, opening at Washington Dulles, Chicago O'Hare and Seattle-Tacoma airports, will allow for 300,000 more flights nationwide annually, says FAA Acting Administrator Robert Stur-gell. Nevertheless, a May 2007 FAA report identifies 14 airports that will soon face capacity constraints unless more new runways or new airports are built. FAA's efforts to streamline the project-approval process have been hurt by the wait for reauthorization, says Sturgell (ENR 10/13 p. 11). "The continuing resolutions in the past several years have also hurt," he says. "Last year we couldn't send grants to airports until well into the fiscal year, so some projects slowed down. Folks are saying we could see a reauthorization bill in late spring. It really depends on the new administration."
机译:随着3条新的美国跑道于11月20日正式开放,美国联邦航空管理局(Federal Aviation Administration)法案将为机场改善拨款提供资金,该法案将包括对未来跑道项目更简化的流程,目前仍在等待重新授权。美国联邦航空局代理局长罗伯特·斯特-盖尔说,这些跑道分别在华盛顿杜勒斯机场,芝加哥奥黑尔机场和西雅图-塔科马机场开放,每年将在全国范围内增加300,000架航班。尽管如此,美国联邦航空局(FAA)2007年5月的一份报告指出,除非建立更多的新跑道或新机场,否则14个即将面临运力限制的机场。斯特吉尔说,FAA简化项目审批流程的工作因等待重新授权而受到损害(ENR 10/13第11页)。他说:“过去几年的持续决议也给我们带来了伤害。” “去年,我们直到财年才向机场发送赠款,因此一些项目放慢了速度。人们说我们可以在春季末看到重新授权法案。这实际上取决于新政府。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号