首页> 外文期刊>Engineering news-record >Workforce and fleet swarms on New Orleans flood defenses
【24h】

Workforce and fleet swarms on New Orleans flood defenses

机译:劳动力和舰队蜂拥而至的新奥尔良洪水防御

获取原文
获取原文并翻译 | 示例
       

摘要

As hurricane season dawnedon June 1, Shaw Environmental & Infrastructure Group, Baton Rouge, headed into production mode on construction of a $695-million, 2-mile-long, gated storm-surge barrier to help protect the southeast flank of New Orleans. By midsummer, more than 100 cranes and supply barges will be engaged. Under contract to the U.S. Army Corps of Engineers, Shaw is using a 500-ton crane to set and drive 66-inch-dia, 144-ft-long concrete spun-cast cylinder piles to form the vertical face of the surge-barrier wall.
机译:飓风季节在6月1日到来时,邵氏环境与基础设施集团(Baw Rouge)进入生产模式,建造了耗资6.95亿美元,长达2英里,封闭的风暴潮屏障,以保护新奥尔良的东南侧。到仲夏,将有100多台起重机和补给驳船投入使用。根据与美国陆军工程兵团的合同,邵氏公司使用一台500吨的起重机来设置和驱动直径66英寸,长144英尺的混凝土细喷圆筒桩,以形成浪涌隔离墙的垂直面。 。

著录项

  • 来源
    《Engineering news-record》 |2009年第18期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号