首页> 外文期刊>Engineering news-record >Bridge Solution Serves Users Faster
【24h】

Bridge Solution Serves Users Faster

机译:桥接解决方案更快地为用户服务

获取原文
获取原文并翻译 | 示例
       

摘要

Accelerated bridge construction (ABC) techniques are gaining ground in transportation departments across the nation because they deliver quality in a shorter amount of time. Prefabricated and precast elements, tested and proven through private industry projects, are now finding their place in bridge design to speed construction. Another ABC option is to build a bridge on the roadside, then use self-propelled modular transporters to lift the structure and drive it onto abutments. We used this technique on Utah Dept. of Transportation's 4500 South bridge replacement project in Salt Lake City. Post-project surveys confirmed that 95% of the traveling public was "satisfied" or "very satisfied" with how the project went.
机译:加速桥梁建设(ABC)技术在全国范围内的运输部门中日益普及,因为它们可在更短的时间内交付高质量的产品。预制件和预制件经过私营行业项目的测试和验证,现已在桥梁设计中找到自己的位置,以加快施工速度。 ABC的另一种选择是在路边建造一座桥,然后使用自行式模块化运输车来抬起结构并将其驱动到桥台上。我们在盐湖城犹他州交通运输部的4500座南桥更换项目中使用了该技术。项目后的调查证实,有95%的旅行公众对项目的进展表示“满意”或“非常满意”。

著录项

  • 来源
    《Engineering news-record》 |2009年第9期|p.71|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:15:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号