首页> 外文期刊>Engineering news-record >Fast-Tracked Mojave Projects Could Boost California Output
【24h】

Fast-Tracked Mojave Projects Could Boost California Output

机译:快速跟踪的莫哈韦沙漠项目可以提高加利福尼亚的产量

获取原文
获取原文并翻译 | 示例
       

摘要

West Coast solar power could get a major boost if the California Energy Commission approves as many as six of 13 proposed utility-scale solar projects in Southern California's Mojave Desert by year-end.rnAt a series of meetings in October and November, the CEC will consider authorizing construction for some of the largest solar installations since 354MW went online in the 1990s. An additional 3,500 MW of capacity-an estimated $18 billion worth of installed capacity-could be added, testing recent advances in solar-trough and concentraring-thermal-power-tower technologies.
机译:如果加利福尼亚能源委员会在年底之前批准南加州莫哈韦沙漠13个拟议的公用事业规模太阳能项目中的多达6个,则西海岸的太阳能发电将得到极大推动。在10月和11月的一系列会议上,CEC将考虑自1990年代354兆瓦上网以来授权的一些​​最大的太阳能装置的建设。可以增加3,500兆瓦的装机容量(估计装机容量为180亿美元),测试太阳能槽和集中式火力发电塔技术的最新进展。

著录项

  • 来源
    《Engineering news-record》 |2010年第8期|P.17|共1页
  • 作者

    JT Long;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号