首页> 外文期刊>Engineering news-record >Powerplant Contractors Under Pressure at Two Project Sites
【24h】

Powerplant Contractors Under Pressure at Two Project Sites

机译:电厂承包商在两个项目现场的压力下

获取原文
获取原文并翻译 | 示例
       

摘要

The future of new nuclear plant construction in the United States hinges upon the performance of The Shaw Group and partner Westinghouse Electric as they build the first new U.S. nuclear reactors in more than 20 years, speakers at the Nuclear Energy Insider Nuclear Construction Summit agreed at the event on Oct. 26 in Charlotte, N.C. "Clarence and his team are make-or-break. If the team at Vogtle stumbles and falls, it is all over for us," Bob Coward, principal at Alexandria, Va.-engineering firm MPR Inc., said of keynote speaker and CEO Clarence Ray Jr. and his Shaw Power Group team.
机译:美国核能内幕人士核能建设峰会的发言人在会上达成共识,美国新核电站建设的未来取决于邵氏集团和合作伙伴西屋电气在20多年来建造美国第一座新核反应堆时的表现。 10月26日在北卡罗来纳州夏洛特举行的活动“弗吉尼亚州工程公司的负责人鲍勃·科沃德(Bob Coward)说:“克拉伦斯和他的团队是成败攸关的。如果沃格特尔的团队跌跌撞撞,对我们来说一切就结束了。 MPR Inc.谈到主题演讲者兼首席执行官Clarence Ray Jr.和他的Shaw Power Group团队时说。

著录项

  • 来源
    《Engineering news-record》 |2011年第13期|p.14|共1页
  • 作者

    Pant Radtke Russell;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号