首页> 外文期刊>Engineering news-record >Settlement Between HDR and Tampa Bay Water Hits Snag
【24h】

Settlement Between HDR and Tampa Bay Water Hits Snag

机译:HDR与坦帕湾水域之间的交接遇到了障碍

获取原文
获取原文并翻译 | 示例
       

摘要

On Oct. 17, the Tampa Bay Water board is planning to vote again on a proposed $30-million legal settlement with HDR Engineering, Omaha, over flaws at the utility's 15.5-billion-gal reservoir. The utility's board voted 4-3 on Sept. 19 to approve the settlement, and later that day Tampa Bay Water announced the deal. However, lawyers for Tampa Bay Water soon pointed out that the vote was not valid because all legal settlements require five members to approve. The utility says it is considering the Sept. 19 vote a "conditional approval" of the settlement until the board meets on Oct. 17. The settle-
机译:10月17日,坦帕湾水务局计划就该公用事业公司耗资155亿加仑的水库的瑕疵,与奥马哈HDR工程公司以3,000万美元的法律和解方案进行表决。该公司董事会于9月19日以4票对3票通过了该和解协议,当天晚些时候,坦帕湾水务公司宣布了该交易。但是,坦帕湾水务公司的律师很快指出,该投票无效,因为所有法律解决方案都需要五名成员批准。该公用事业公司表示,正在考虑将9月19日的投票作为和解协议的“有条件批准”,直到董事会于10月17日举行会议为止。

著录项

  • 来源
    《Engineering news-record》 |2011年第9期|p.4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:28

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号