首页> 外文期刊>Engineering news-record >Fight Over FAA Stopgap Cuts Off Airport Contracts
【24h】

Fight Over FAA Stopgap Cuts Off Airport Contracts

机译:争夺FAA权宜之计切断了机场合同

获取原文
获取原文并翻译 | 示例
       

摘要

A congressional battle that blocked passage of a new stopgap Federal Aviation Administration bill has caused the FAA to Issue stop-work orders on about 80 airport engineering and construction contracts, totaling more than $790 million, around the country. The failure to pass a new authorization bill before the old one expired on July 22 has also tied up an additional $2.5 billion in infrastructure funds, as FAA put a hold on awarding new grants from its Airport Improvement Program (AIP). Moreover, the agency furloughed about 4,000 of Its 47,000 workers.
机译:一场国会之战阻止了一项新的权宜之计,导致联邦航空局(FAA)在全国范围内发布了约80项机场工程和建设合同的停工订单,总金额超过7.9亿美元。由于美国联邦航空局(FAA)暂停从其机场改善计划(AIP)授予新拨款,未能在旧法案于7月22日到期之前通过新的授权法案的做法还捆绑了25亿美元的基础设施资金。此外,该机构还解散了其47,000名工人中的4,000名。

著录项

  • 来源
    《Engineering news-record》 |2011年第4期|p.11|共1页
  • 作者

    Tom Ichniowski;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号