首页> 外文期刊>Engineering news-record >Contract Award Expected in June for Tampa Reservoir Repair
【24h】

Contract Award Expected in June for Tampa Reservoir Repair

机译:坦帕水库维修预计将于6月份授予合同

获取原文
获取原文并翻译 | 示例
           

摘要

In June, Tampa Bay Water expects to select either Granite Construction Co., Kiewit Infrastructure South or Skanska USA Civil Southeast as the design-build-maintain contractor for the cracked C.W. Bill Young Regional Reservoir. Ranging from $120 million to $170 million, the three recently received bids are to repair the soil-cement erosion-control layer and expand the reservoir by about 40%. Notice to proceed for permitting is scheduled for Sept. 1, with a construction start anticipated a year later. About 12 months after its 2005 opening, cracks began forming in the 15.5-billion-gal reservoir, designed by HDR Engineering and built by Barnard Construction.
机译:坦帕湾水务公司预计在6月选择Granite Construction Co.,Kiewit Infrastructure South或Skanska USA Civil Southeast作为破裂的C.W. Bill Young地区水库的设计-建造-维护承包商。最近收到的三个竞标价格从1.2亿美元增至1.7亿美元,用于修复土壤水泥侵蚀控制层并使水库扩大约40%。准许进行许可的通知定于9月1日进行,预计将于一年后动工。在2005年开放后约12个月,由HDR Engineering设计并由Barnard Construction建造的155亿加仑水库开始形成裂缝。

著录项

  • 来源
    《Engineering news-record》 |2011年第12期|p.9|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号