Addressing Challenges Associated with Construction Slowdown

机译:应对与建设放缓相关的挑战

获取原文
获取原文并翻译 | 示例
       

摘要

Those competing for today's smaller pool of construction dollars face several new challenges as a consequence of the massive slow down of construction.rnMore and more companies are competing for the same projects. Consequently, there are more bid protests and closer scrutiny of bid packages. This heightened scrutiny is taking place not only in federal procurement, but also at the state and local level. With competition so high, contractors must make sure they fully comply with prequalification criteria and the solicitation, including the nuances that are sometimes found from one state to the next on public procurement.
机译:那些争夺当今更小的建筑资金的人由于建设速度的大幅放缓而面临着一些新的挑战。越来越多的公司正在竞相争夺相同的项目。因此,出现了更多的抗议示威活动,并对投标方案进行了更严格的审查。不仅在联邦采购中,而且在州和地方一级,都在进行严格的审查。由于竞争如此激烈,承包商必须确保他们完全符合资格预审标准和招标要求,包括在公共采购中有时从一个州到另一个州之间发现的细微差别。

著录项

  • 来源
    《Engineering news-record》 |2011年第9期|p.L7|共1页
  • 作者

    Bob Chambers;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号