首页> 外文期刊>Engineering news-record >Drain Solution Minimizes Construction Impact at FedEx Hub
【24h】

Drain Solution Minimizes Construction Impact at FedEx Hub

机译:排水解决方案最大程度地降低了FedEx Hub的施工影响

获取原文
获取原文并翻译 | 示例
       

摘要

The FedEx Express [FedEx] Memphis World Hub has made the Memphis International Airport the second busiest cargo airport in the world. The firm recently worked with Allen & Hoshall inc. to construct a two-story canopy for international sorting operations that required a drainage collection system to remove sheet flow from the construction area. "Logistics and schedule sensitivity have been paramount requirements to achieve the success that FedEx expects and Frierson plans to deliver," says Ben Eberle, pre-construction manager with T.W. Frierson Contractor Inc.
机译:联邦快递[FedEx]孟菲斯世界枢纽使孟菲斯国际机场成为全球第二繁忙的货运机场。该公司最近与Allen&Hoshall Inc.合作。为国际分拣作业建造一个两层的顶篷,该顶篷需要一个排水收集系统才能从建筑区域清除表层水。 T.W的施工前经理Ben Eberle表示:“物流和进度敏感性是实现FedEx期望的成功和Frierson计划交付的首要条件。弗里森承包商公司

著录项

  • 来源
    《Engineering news-record》 |2012年第5期|p.W4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号