首页> 外文期刊>Engineering news-record >Ontario Limits Nukes in New Plan
【24h】

Ontario Limits Nukes in New Plan

机译:安大略限制新计划中的核武器

获取原文
获取原文并翻译 | 示例
           

摘要

Ontario will defer indefinitely construction of two new nuclear-power reactors at the Darlington and Bruce Power facilities, scale back plans to refurbish operating units at those sites and may order the shutdown of another six-unit plant before its scheduled 2020 closing date, according to a long-term energy plan the provincial government released earlier this month. The province said that advances in energy conservation, enhanced efficiency and a slowdown in electricity-demand growth prompted it to revise a 2010 energy plan that called for building the two new reactors at the Darlington powerplant site as well as refurbishing 10 units there and at a site owned by utility Bruce Power. Ontario Power Generation owns the Darlington site.
机译:安大略省将无限期推迟在达灵顿和布鲁斯电力设施建造两个新的核电反应堆,缩减计划以翻新这些地点的运营单位,并可能在其预定的2020年关闭日期之前下令关闭另一座6单元的工厂。省政府本月初发布的一项长期能源计划。该省表示,节能的进步,效率的提高以及电力需求增长的放缓促使其修订了2010年的能源计划,该计划要求在达灵顿电厂现场建造两个新反应堆,并在那里和附近翻修10台机组。实用程序Bruce Power拥有的网站。安大略省电力公司拥有达灵顿工厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号