首页> 外文期刊>Engineering news-record >BIM Platform Increases Quality And Efficiency Of Reclamation Facility Expansion
【24h】

BIM Platform Increases Quality And Efficiency Of Reclamation Facility Expansion

机译:BIM平台提高了填海设施扩建的质量和效率

获取原文
获取原文并翻译 | 示例
       

摘要

The $226-million Pima County Tres Rios Wastewater Reclamation Facility Upgrade and Expansion project in Tucson, Ariz., is a major renovation to expand the plant capacity from 37.5 MGD to 50 MGD, as well as the replacement and upgrade of an outdated wastewater stripping plant with a state-of-the-art wastewater reclamation plant. MWH Constructors, the construction manager-at-risk, implemented BIM tools and techniques to drive quality and efficiency on more than $45 million in self-perform work that ranges from equipment procurement and installation to commissioning and startup of systems in 22 new and existing facilities, and 10 miles of underground pipeline.
机译:位于亚利桑那州图森的耗资2.26亿美元的皮马县Tres Rios废水再生设施升级和扩建项目是一项重大改造,旨在将工厂产能从37.5 MGD扩大至50 MGD,以及更换和升级过时的废水剥离厂拥有最先进的废水回收厂。 MWH Constructors,施工风险经理,实施了BIM工具和技术,以提高质量和效率,进行了超过4,500万美元的自完成工作,从设备采购和安装到在22个新工厂和现有工厂中的系统调试和启动, ,以及10英里长的地下管道。

著录项

  • 来源
    《Engineering news-record》 |2013年第8期|P25-P26|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号