首页> 外文期刊>Engineering news-record >$2.6-Billion Job Fires Up In Louisville
【24h】

$2.6-Billion Job Fires Up In Louisville

机译:26亿美元的工作在路易斯维尔展开

获取原文
获取原文并翻译 | 示例
       

摘要

Virtual-reality tools and ramped-up deadline goals are propelling the $2.6-billion Ohio River Bridges project out of the starting gate. Workers are driving piles now to reconstruct the ramps for the John F. Kennedy Memorial Bridge and the interchanges at which Interstate 65,I-64 and I-71 intersect in Louisville, Ky. The interchange work is a $425-million portion of the project, which will entail building a second bridge that will carry northbound traffic, doubling the so-called Downtown Crossing's capacity to and from southern Indiana on I-65.
机译:虚拟现实工具和加快的最终期限目标正在推动这项耗资26亿美元的俄亥俄河桥梁项目的起步。现在,工人们正在大堆重建约翰·肯尼迪纪念桥的坡道,以及肯塔基州路易斯维尔的65号州际公路,I-64号州际公路和I-71号州际公路相交的交汇处,该交汇工程是该项目的4.25亿美元,这将需要建造第二座桥梁来进行北行交通,从而使I-65州际往返印第安纳州南部的通行能力翻倍。

著录项

  • 来源
    《Engineering news-record》 |2013年第4期|8-9|共2页
  • 作者

    Nicholas Zeman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号