【24h】

Bid/Proposal Dates

机译:投标/投标日期

获取原文
获取原文并翻译 | 示例
           

摘要

California 6/25 The City of Bakersfield is seeking bidders to carry out the state Route 178 widening project. The project team will widen the freeway to two lanes and one auxiliary lane between Fairfax Road and Morning Drive and to two lanes from Morning Drive to Canteria Drive. Further, Morning Drive will be widened to three lanes in each direction, from just north of Panorama Drive to just south of SR 178. Finally, state Route 58 will be widened to six lanes from four, from 0.5 miles east of the Route 99 grade separation to the Cotton-wood Road overpass. The project's value has been estimated at $32 million. City of Bakersfield, Purchasing Division, 1600 Truxtun Ave., Bakersfield, 93301. DR#10-00672545.
机译:加利福尼亚6/25贝克斯菲尔德市(Bakersfield)正在寻求竞标者来进行州178号公路的扩建项目。项目团队将把高速公路扩宽为费尔法克斯路和早晨路之间的两条车道和一条辅助车道,以及从早晨路到坎特里亚路的两条车道。此外,Morning Drive将在每个方向上扩大到三个车道,从Panorama Drive的北部到SR 178的南部。最后,州际公路58将被扩大到从99号公路以东0.5英里的四个车道的六个车道分离到棉木路立交桥。该项目的价值估计为3200万美元。贝克斯菲尔德市采购部,地址:1600 Truxtun Ave.,贝克斯菲尔德,邮编:93301。DR#10-00672545。

著录项

  • 来源
    《Engineering news-record》 |2013年第17期|75-75|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号