首页> 外文期刊>Engineering news-record >Alternate Delivery Rebounds
【24h】

Alternate Delivery Rebounds

机译:备用送货回弹

获取原文
获取原文并翻译 | 示例
       

摘要

The market for alternate project-delivery methods is rising again. During the recession, many owners that turned to low-bid design-bid-build to find the lowest prices were burned by bad projects. Now, many of these same owners are returning to alternate project-delivery methods, seeking greater efficiencies in the construction process. Further, the maturing of new delivery technologies, such as building information modeling (BIM) and virtual design and construction (VDC), work best in a collaborative setting, causing owners to look more closely at alternate project delivery.
机译:替代项目交付方式的市场再次上升。在经济衰退期间,许多寻求低价设计竞标价格以找到最低价格的业主被糟糕的项目烧死了。现在,这些相同的所有者中的许多人正在返回替代的项目交付方法,以寻求更高的施工过程效率。此外,新的交付技术(例如建筑信息模型(BIM)和虚拟设计与施工(VDC))的成熟在协作环境中效果最佳,从而使所有者更加密切地关注替代项目的交付。

著录项

  • 来源
    《Engineering news-record》 |2013年第16期|25-28|共4页
  • 作者

    Gary J. Tulacz;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号